Welcome to Haina Fastener!
WhatsApp/Wechat : +86-18668368299     Email : tony@hainafastener.com
JIAXING  HAINA  FASTENER  CO.,LIMITED
  • Product Name
  • Product Keyword
  • Product Model
  • Product Summary
  • Product Description
  • Multi Field Search
Home / Technical Info / Project / Temburong Marine Viaduct -CC2

Temburong Marine Viaduct -CC2

Views:51     Author:Site Editor     Publish Time: 2017-04-12      Origin:Site

The Temburong Bridge Project is a 30km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei districts. The main objective of the project is to stimu-late economic growth in the Temburong region by connecting it to the country’s airport and ports. The alignment crosses two navigation channels resulting in the need for two cable stayed bridges – the Brunei Channel Bridge (145m main span) and the Eastern Channel Bridge (260m main span).

The design of these cable stayed bridges is one of the first ap- plications of the Eurocode to a fully concrete cable stayed bridge. Both cable stayed bridges draw on strong Islamic ar-chitectural influences from the region to form a tower shape that is unique and instantly recognisable.

Jiaxing Haina fastener Provide stud bolt and hex nut, Stud bolt tensile trength is more than 700MPA. It is was test by SGS lab.


All rights reserved Jiaxing Haina Fastener Co.,Limited  Privacy Policy