Temburong Marine Viaduct -CC2-CC3-CC4-Temburong

Author: Site Editor     Publish Time: 2017-04-12      Origin: Site

Temburong Marine Viaduct -CC2-CC3-CC4-Temburong

The Temblon Bridge, the largest infrastructure project in Brunei's history, is a key link between brunei mainland and The Temblon region. With a total length of about 30 km, the bridge includes about 11.6 km of fully prefabricated viaduct traversing unexplored tropical rainforest.  Chen Hongke, the project manager, introduced the so-called assembled bridge, colloqually speaking, is to use the method of "building blocks" to "spell" a bridge.  Compared with traditional bridge construction method, full prefabrication construction is more energy saving and environmental protection.  The connecting pieces on the bridge are provided by our company with stud bolts and stainless steel bolts and nuts, which are strong and durable, have good compressive and anticorrosion performance, and bring great guarantee to the firmness of the Tambulong Bridge. We can provide test reports and 3.1 certificates.  



Jiaxing Haina Fastener
Jiaxing Haina Fastener Co., Ltd. was founded in 2012 and is a professional fastener sales supplier. Our main products include bolts, nuts, screws, etc., with a complete range to meet the needs of different customers. We are committed to providing customers with high-quality products and services, and have won the trust and praise of our users.
Contact Us
Manager : Tonyfang
+86-186 6836 8299
tony@hainafastener.com

  +86-0573-82272371

 +86-0573-82210271

  1-405 No.1888 Canaan Plaza Zuili Road, Nanhu District Jiaxing City Zhejiang Province 314050

All rights reserved Jiaxing Haina Fastener Co.,Limited | Privacy Policy